Sunny and clear. Low winds from the South. 

To do:

  • Reshoot boom angles at site 8 where we used tripod for stabilizing. We think tripod could be affecting the compass.
  • Test wisard board in the trailer
  • Install wisard board on the soil TP sensor at site 1. 
  • Clean radiometers at station 9

Ongoing:

  • Watching main tower wdir data and forecasts to determine appropriate conditions to have wind turbine turned off (at the request of the PI). She's looking for ENE winds between 40-80deg greater than 5m/s

**Down day planned for tomorrow

 

T/RH: 42m  TRH still reporting warmer and drier than at other levels
P: ok
2D Gill: ok
csat u,v:  ok
csat ldiag: ok
csat w, tc: ok
3D RMY: ok
EC150: ok
motes: ok
Wetness: ok
radiation: ok
Tsoil: ok
Gsoil: ok
Qsoil: ok
Cvsoil: Will test install today
Rainr: ok.
Vbatt: ok