After the reconfiguration, pressure 9t was bad. Steve fixed the serial input cable for 9t in pressure 2 to make better contact with the RJ45 connector. This was completed around 16:00 PDT, July 20.
After the reconfiguration, pressure 9t was bad. Steve fixed the serial input cable for 9t in pressure 2 to make better contact with the RJ45 connector. This was completed around 16:00 PDT, July 20.