Skip to end of metadata
Go to start of metadata

Jakob had pointed out that most of the network was down.  (I've been on vacation and hadn't been monitoring.)  Apparently stations went down in the last lightning storm (again!), either Fri or Sat.  I just:

  • found a dead power supply in rne01 and replaced it with the one from rne02.  Of course, rne02 is a <repeater> so much of the network is still down.
  • reset differential protection on tse13
  • reset differential protection on tse11
  • reset differential protection on tse09

Of course, this is now <tear down>, so we shouldn't be working to <maintain> the network.  Nevertheless, several groups are still running, using this period for post-cals, etc.  Eventually, DTU will rework the network for operation after we are gone.

 

  • No labels

1 Comment

  1. Steven Oncley AUTHOR

    Later (~7pm), replaced power supply at rne02 and reset differential protection on tnw10 (both repeater sites) to get even more of the network up.