Operations
< 2012.04.06 > Running standard METRo model at all sites.
Desired Experiments
Switch from clouds to radiation data
< insert notes >
Adjustments for NHRA sites
< 2012.04.06 > David notes that our forecasts seem to be low at NHRA sites. This could be because the surface is coated in black rubber.
Incorporate TRD in situ data
< insert notes >
Alter pavement forecast to handle shading
< 2012.04.06 > Possibly run one version of the model that is forced to 100% cloud cover?
Alter pavement forecast to handle banking
< insert notes >
Alter forecasts to get a 20-minute time step
< insert notes >