Chenning and Khuong working on the pressure measurement system at these times:
June 27, 2008:
Morning. Hung the horizontal pressure reference line.
4:45-5:15 PM. Working on the 1/4 in tubing, connecting them to the pressure transducers.
June 28, 2008
9:00-11:00am. Putting 1/16 in couplers to the transducers on the lower array. The tubing on the transducer is hard and the coupler cannot be inserted directly, a heat gun was used to melt the tubing in order to insert the coupler.
1:30-3:00 pm.
Connecting 1/4 tubing to the pressure ports
June 29, 2008
8:30-9:15 am. Connecting 1/4 tubing to the pressure ports
8:30-9:30 am. Dug a hole for the reference cylinder