Chenning and Khuong working on the pressure measurement system at these times:

June 27, 2008: 

         Morning. Hung the horizontal pressure reference line.
         4:45-5:15 PM. Working on the 1/4 in tubing, connecting them to the pressure transducers.

 June 28, 2008

       9:00-11:00am. Putting 1/16 in couplers to the transducers on the lower array. The tubing on the transducer is hard and the coupler cannot be inserted directly, a heat gun was               used to melt the tubing in order to insert the coupler.

    1:30-3:00 pm.
 Connecting 1/4 tubing to the pressure ports 

June 29, 2008

   8:30-9:15 am. Connecting 1/4 tubing to the pressure ports 
   8:30-9:30 am. Dug a hole for the reference cylinder