From about 16001635-1730 1735 I reconfigured pressure yet again. (See 11b signal for exact times.)
- 11b transducer removed and inserted into the CHATS system (which was buried yet again) to monitor Pref (in parallel with the Vaisala PTB220).
...
From about 16001635-1730 1735 I reconfigured pressure yet again. (See 11b signal for exact times.)
- 11b transducer removed and inserted into the CHATS system (which was buried yet again) to monitor Pref (in parallel with the Vaisala PTB220).
...