We lowered the tower before we left, but left it vertical. We loosened each of the guy wire turnbuckles by 3 turns before we lowered the tower.  They probably would be fine left this way, so we installed anti-twist cable ties on the turnbuckles.


Misc notes/to do:

  • Job box is now locked, bring keys if you want to get into it.
  • Generator is almost completely out of gas! It'll need to be refilled before we can run it again.
  • Bring the (charged) generator battery back to the trailer and reinstall it.
  • Remember to take the tennis ball off the lightning protection next time we pivot the tower down (oops!)
  • While removing the tennis ball, cover the 2 unused nanobarometer Bulgin connectors with caps (we didn't have any – just used tape)
  • Try a new USB cable for the power monitor
  • Note that the guy turnbuckles fall off of the large D rings, and may bind when next raised.  CHECK THEM when near the top of raising.  Probably should secure them in place with cable ties.
  • Networking!