 June 28, 2008

    9:00-11:00am. Putting Put 1/16 in couplers to the transducers on the lower array. The tubing on the transducer is hard and the coupler cannot be inserted directly, a heat gun was               used to melt the tubing in order to insert the coupler.

    1:30-3:00 pm. Connecting Connected 1/4 tubing to the pressure ports 

June 29, 2008

   8:30-9:15 am. Connecting Connected 1/4 tubing to the pressure ports 
   8:30-9:30 am. Dug a hole for the reference cylinder

...

    9:00-10:10 AM. Buried the reference cylinder. Covered it with a thermal blanket. Ready to test and take data.

July 1 

   12:00 - 1:00 PM. The straight and T couplers came in. Finished the reference sides of the transducers on the upper array.