Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  •  Install ground rod and strap to DSM
  •  Install TRH probes
  •  Install mote and soil sensors
  •  Replace ethernet cable to ubiquiti (the plastic tab that locks it in place is broken on one end)
  •  Bolt job box to trailer (used guy wire and pad lock, key is in job box)
  •  Add crosbys
  •  Find key that opens rigid box
  •  Install 2m TRH probe

SE4:

  •  Add bulgin cable for nanobarometer
  •  Add second USB backup since ubiquiti link doesn't work
  •  Install TRH probe
  •  Install mote and soil sensors
  •  Add parsing Victron power monitor to config
  •  Replace sock on EC150

...