~0900: opened ref volume
- removed cap with capillary leak
- stuffed more steel wool (about double) in this side
- replace cap with solid cap
- removed sample cap
- stuffed more steel wool in this side
- replaced cap
0925-0937: sat in this configuration to allow P.0m to monitor Pref
0937:
- removed garden hose from CHATS system, noted that big hose fitting was somewhat loose, repaired with teflon tape?
- changed P.0m from AHATS Pref to garden hose/Bedard
- plumbed Pref back to CHATS system (using 11b.4.8m 202BG)
0955: covered up with dirt/space blanket again