We have instrumented the tower!!!  We are all exhausted from todays setup.

We have all levels up except for the four component radiation and the canopy par wand.  These should be done tomorrow.

Trailer power is up and running.  The power to tower is not, but this is waiting on ACD due to where the trailer will reside.  

Things to do:

Four component on tower.

Par wand at canopy height.

ACD tubes installed.

soil probes installed.

power to tower.

ACD loaded.