Just was out from about 1245-1300:

- reseated connectors for Qsoil.b (both binder and DIN).

- cleaned a small amount of gunk from tipping bucket tube.  During this process, there was one tip of "delayed" rain (water was dumped out of the tipper).

- mounted PAR.2m in its final position.  Have just added "Rpar.2m" to the config and restarted dsm_server.

- Swapped soil.a battery yet again.  This time, swapped out the (somewhat broken) console cable.  Also disconnected the internal red wire from the charging circuit, so this isn't being charged by the solar panel.  (Also need to remember to reconnect when charging it up in the base.)  We'll see if this improves the discharge rate of batteries at this site.

- Did a final rescan of soil.b, just in case....