We have started some teardown at the ISS site.RASS is being taken down. Note almost 50% of nuts and bolts on rass surrounds were cross threaded and had to be cut off. Electric fence is down. Will finish up new AC cover today.

There have be several short storm fronts move through with rain and light snow with 10 meter per second winds. Afternoon it cleared up .

Profiler power .158 mW.