Clear skies, but windy, cool.

Kate arrived. SteveO leaving today.

To dos:

  • Reshoot boom angles at 60m and CSAT S8 and S15  We've set up the binos on a tripod.
  • Soil core at S1, a second at S15
  • Install and "manually" read another TP01. Steve is taking two TP01 wisard boards back to Boulder for rehab.
  • Install EC150 at S13.  We've checked that it is ready to go.

Station Status: All up.

Sensor Status:

T/RH: 42m  TRH now not reporting. Power cycle does not bring it back. Others okay (note that S1,2,9,10 are wired not to report Ifan).
P: ok
2D Gill: ok
csat u,v:  ok
csat ldiag: ok
csat w, tc: ok
3D RMY: ok
EC150: ok
motes: ok
Wetness: ok
radiation: ok
Tsoil: ok
Gsoil: ok
Qsoil: ok
Cvsoil: Ready to manually read sensor
Rainr: ok, reported about 1/4" today.
Vbatt: Vbatt.tower at 12.6V on 10/9