Rain last night from 01-03AM, according to ISS, and some drizzle just ended.  co2.6m.init now is not reporting, but all else seems to be up.  Some standing water in the fields driving in.  The dusttracks on the ground flooded with apparently flowing water in the gully getting up to 10cm or so (based on grass bent around cables going up the towers).  We'll be working to rearrange these over the weekend.

Did some more power rearrangement after working through the power spreadsheet.  There still are some mysterious loads, but what we did should help for a while.  relm should now be being monitored.  

  • Added extra 65W solar panels to UConv.m and Init.m.
  • Took a battery from Init.b and added it to Lconv.m.
  • Took a battery from Uconv.1, added it to Uconv.m
  • Added power monitor cable to Rel.m