snow flurries, and about 0.5" on the ground.  Cloudy, temp about 25F with moderate wind.  Ground is frozen for first 2cm, so vehicles could drive into field. It was a bit hard to chip through the crust, but the ground was soft to remove soil sensors.

Kurt & Bob Wiley tore down all 6 pressure sites.

Dan & Steve (with some help from Kurt & Bob) removed all sensors/cables/batteries/aux towers from lconv, leaving the stripped 20m tower and solar panels.

Moved all sensors back to base.  Infrastructure still in the field.

We took a lunch break to warm up and refuel (ourselves).

Labeled batteries:

  • Golf batteries: LC0'm, LC1'm (0 connected to charger)
  • Other 2 lconvm: LC2m, LC3m
  • Other site batteries: LC0, LC1 (only 2?)
  • Also labeled power monitors as LCm and LC.  Note that LCm had a non-sunsaver controller.

Decided not to record sensor serial numbers, since should already know them.  I wasn't sure about rad/soils, so:

  • left all soybean soil sensors cabled together to mote 21
  • 2794(?) NR01 came from soybeans, placed in middle, next-to-bottom row in black case
  • NR01 from 20m.lconv is in the right, next-to-bottom row in black case.

All in all, we're pleased with how the day went.

  • No labels