Log in
wiki.ucar.eduwiki.ucar.edu
  • Spaces
  • Collections
  • Hit enter to search
  • Help
    • Online Help
    • Keyboard Shortcuts
    • Feed Builder
    • What’s new
    • About Confluence
  • Log in

AHATS Field Project
  • Pages
  • Blog

Blog

  • 2013
  • 2012
  • 2011
  • 2010
  • 2009
  • 2008
    • December
    • November
    • August
    • July
      • some Pref tubes insulated
      • H-frame sonics moved
      • Checking GPS units
      • pressure spectra examples
      • pressure2 crash
      • alfalfa bales
      • config 3 dimensions
      • config 2 dimensions
      • config 3 started!
      • 8m sonic data
      • pocketecs exchanged
      • upwind now okay?
      • Daily status, July 27
      • Tripods down
      • p' leak closed
      • upwind rebuilt
      • upwind crash
      • p' reconfigure
      • more config2 dimensions
      • config2 boom angles
      • Phase 3 configuration
      • Upwind status
      • swapped TRHs
      • UPWIND status
      • p' reconfiguration
      • Daily status, July 25
      • pressure2 died
      • upwind really sick
      • yet another p' system configuration
      • upwind power
      • Towers for configuration 3
      • p' system in test mode
      • more upwind crashes
      • serial board failure
      • pressure puzzles
      • sonic data issues
      • Setting up for config3
      • Daily status, July 22
      • profile sonics correctly set
      • 4m TRH changed on profile
      • shortcuts
      • Daily status, July 21
      • Li7500 on profile replaced
      • Fixed 9t pressure at 1600 PDT, July 20
      • Used a serial y cable for 3m profile, 13b sonics
      • Replaced sonic 2b (SN 1117) with 13b (SN 0741).
      • Configuration 2 Sonic configs
      • pressure port orientation
      • Configuration 2 Dimensions
      • Daily status, July 19
      • Stopped adams for reconfiguration
      • GPIO boards in pressure systems
      • Daily status, July 16
      • ASTER rebooted
      • Daily status, July 15
      • Daily status, July 14
      • USBdisk swap
      • ASTER rebooted
      • Ambient pressure change
      • Daily status, July 13
      • Repositioned downwind1 gps antenna
      • Antenna Change
      • Pressure reference change
      • AP24 power reduction
      • USBdisk swap
      • Etherant status
      • Daily status, July 12
      • Daily status, July 11
      • USBdisk swap
      • Good data from SGS HATS
      • Sealed pressure lines
      • etherants down again
      • More leaks
      • Pressure1 down
      • USBdisk Swap
      • Sonic 2b restarted
      • serial port assignments
      • started data merge
      • Daily status, July 9
      • Leak found in Pressure line
      • Pressure 11B back on line
      • Paro 11B back up
      • USBdisk swap
      • Downwind2 link down
      • eanth down
      • barometer connected to reference ta
      • profile and upwind pocketecs
      • downloading pocketecs and usb drives
      • How to dump raw data from ParoScientific 202BGs
      • Daily status, July 8
      • power glitches in base trailer
      • changed serial cards at upwind, downwind2
      • Revised configuration schedule
      • Daily status, July 7
      • installed altered pressure interface cards
      • Daily status, July 6
      • Configuration 1 sonic azimuths
      • Downwind-2 serial board stopped
      • Upwind serial board stopped
      • Downwind-2 serial board stopped
      • sonic 6u offset
      • Daily status, July 5
      • Daily status, July 4
      • Rebooted upwind serial board
      • Lost power and data at upwind adam
      • Downwind-2 serial board stopped
      • Daily status, July 3
      • Daily status, July 2
      • Daily status, July 1
      • Tentative configuration schedule
      • Lowered the upwind array sonics to 3.2 m
      • Array 1 dimensions
      • Data dropout at pressure2
      • Added power supply to profile tower
    • June
Browse pages
  • View Page
    • Attachments (10)
    • Page History
    • Page Information
    • View Source
    • Export to PDF
    • Hide Inline Comments
  1. Dashboard
  2. AHATS Field Project
  3. 2008
  4. July
  5. 17
  6. GPIO boards in pressure systems
  7. Attachments
  8. p1_brd3.pdf

p1_brd3.pdf

Overview
Content Tools

Powered by a free Atlassian Confluence Community License granted to University Corporation for Atmospheric Research. Evaluate Confluence today.

  • Powered by Atlassian Confluence 9.2.13
  • Printed by Atlassian Confluence 9.2.13
  • Report a bug
  • Atlassian News
Atlassian
{"serverDuration": 162, "requestCorrelationId": "755cbb3ca8d790d6"}