Task |
People Assigned |
Target Completion Date |
---|---|---|
Surveillance scan capability at Marshall |
Group |
(completed) |
Full PPI and RHI scan and GUI control capability |
Dixon/VanAndel/Loew |
(complete) |
Install and configure git repository at CSU and EOL |
VanAndel/George |
2009-03-06 (complete) |
Rewire S-Pol receiver and STALO boxes |
Emmett |
2009-02-27 (complete) |
Convert HAWK time series process (RVP8TsTcpServer) to use common time series format (4.4) |
Dixon |
2009-03-13 (complete) |
Convert CHILL time series process (AcquisitionServer) to use common time series format (4.4) |
George |
2010-06-01 |
Build buffer board for S-Pol timing signals (breakout box) (waiting on design info from Eric) |
Emmett |
2009-06-20 (complete) |
build cables to attach Power PMAC to S-Pol pedestal servo amps, S/D board |
Loew/Phinney |
2010-03-30 (complete) |
Replace servo amps in S-Pol |
Phinney |
2009 -12-01 (complete) |
Need new fault board for S-Pol Servo Amps |
Strong |
(complete) |
Antenna Pattern test @ Marshall : setup antenna on CP-2's concrete pad. |
Strong/Phinney/Emett/Bobka |
(complete) |
Cleanup wiring in S-Pol transmitter container |
Emmett/Holden |
2009-04-03 (complete) |
Install new power meters at S-Pol (4.5) |
Holden |
2009-04-03 (complete) |
Convert moments calculation server to use common time series format (4.6) |
George/VanAndel |
2009-04-10(complete) |
Convert HAWK moments calculation software (iq2dsr) to use the common time series format (4.6) |
Dixon |
complete |
Write SDB to Dsr real-time translator (to view CHILL moment data with CIDD) |
Dixon |
complete |
Install NEXRAD/FAA transmitter at S-Pol (2) |
Bobka/Emmett |
2009-04-17(complete) |
Rewrite CHILL system control software (DTctl) (4.2) [completion depends on Power PMAC] |
Brunkow/George |
2009-11-30 |
Initial Power PMAC development, configuration and testing for S-Pol |
VanAndel/Loew w help from Brunkhow |
2009-12-04 (complete) |
Integrate instrumentation server (calsrv) at S-Pol (4.5)with support for 2 dual-channel power meters |
VanAndel |
2009-01-29 |
Build and test new digital waveform generator board (4.1) - not needed by S-Pol |
George |
2010-02-27 |
Integrate CHILL transmit control server (txctl) and digital waveform generator at S-Pol (4.1) |
VanAndel/Emmett/Farias |
2009-12-15(complete) |
S/D converter for S-Pol & Eldora Test Pedestal |
Loew/Farias/Gales |
2009-12-01 (complete) |
Complete S-Pol setup at Marshall |
Bobka/Gales/Emmett/Holden/Phinney/Rivas/Strong |
2009-12-01(Complete) |
Integrate Power PMAC at S-Pol (4.3) |
Loew/Brunkow/Gales/VanAndel |
2009-12-20(complete) |
Integrate CHILL system control software (syscon, aka DTctl) at S-Pol (4.2) |
VanAndel/Dixon/Loew |
2009-12-15(complete) |
Acquisition Server Software (control RVP8 and Moment generation) |
Dixon/VanAndel |
2009-12-30 (complete) |
Initial Antenna/System control GUI |
VanAndel |
2010-04-15 (complete) |
Install HAWK processing system |
Dixon |
2010-04-15 (complete) |
Install CIDD |
Dixon |
2010-04-15 (complete) |
Install CSU Engineering Display |
Dixon/VanAndel |
2010-04-15 |
Update Engineering Display with hot keys and other needed capabilities (from old E. display) |
Dixon/VanAndel |
2010-05-15 (complete) |
ATE installed with software control of calibration equipment |
Dixon/Morley/Emmett |
2010-11-30 |
S-Pol unattended operation |
group |
2010-09-15 (complete) |
PID/precip-rates/refractivity algorithms operational |
Dixon/VanAndel/others |
2010-12-10 |
Define CF-compliant netCDF common data format for integrated radar data (moments). |
Dixon/Van Andel/CHILL staff |
2009-12-15 (complete) |
Real time vector winds from CHILL and S-Pol data |
CSU Staff |
2012-07-015 (After DYNAMO) |
Gridding multi-radar data (S-Pol, CHILL, NEXRAD, Pawnee) |
Dixon/VanAndel/CHILL staff |
2012-07-015 (After DYNAMO) |
Sun Scan, vertical pointing (calibration) capability |
Dixon |
2010-11-31 |
Automated cross-polar power technique for Zdr calibration |
Dixon/Morley |
2011-01-31 |