Clear skies, light wind. Beautiful Day

To dos:

 

Station Status: All up.

 

Main Tower

Gordon just got the TRH sensor at 42 m on the main tower up and running by restarting it. 

 

Station 1

Soil core at S1 completed. Baking now.

Successfully installed TP01 and capped off end and taped it up to keep it out of water and mud during high tide.

 

Station 13 

Cleaned the EC150 3D sonic cable end with contact cleaner and cleaned the cable receptacle. It restarted with success and is collecting data.

Reshot boom angles of sonics at 10 m and 3 m. The 2D sonic at 10 m had an azimuth of 319 deg. The 3D sonic azimuth was 227 deg.

 

Sensor Status:

T/RH: 42m  TRH came back after being power cycled. Others okay (note that S1,2,9,10 are wired not to report Ifan).
P: ok
2D Gill: ok
csat u,v:  ok
csat ldiag: ok
csat w, tc: ok
3D RMY: ok
EC150: ok
motes: ok
Wetness: ok
radiation: ok
Tsoil: ok
Gsoil: ok
Qsoil: ok
Cvsoil: Ready to manually read sensor
Rainr: ok.
Vbatt: Vbatt.tower at 12.6V on 10/9