Wet over night, 105% RH. Partly cloudy today and cool, light breeze.

To dos:

 

Station Status: S11 is down.

 

T/RH: 42m  TRH came back after being power cycled. Others okay (note that S1,2,9,10 are wired not to report Ifan).
P: ok
2D Gill: ok
csat u,v:  ok
csat ldiag: ok
csat w, tc: ok
3D RMY: ok
EC150: ok
motes: ok
Wetness: ok
radiation: ok
Tsoil: ok
Gsoil: ok
Qsoil: ok
Cvsoil: Ready to manually read sensor
Rainr: ok.
Vbatt: Vbatt.tower at 12.6V on 10/9