A somewhat frustrating day.  We started with the plan to instrument the short towers that have been erected.  (Today, we confirmed that tse12 is built and tse10 has two (unguyed) sections in the air.)   Already, though, two of those towers need booms from Samortecnica that we do not yet have, so we wouldn't have been able to complete this job.  Nevertheless, I gathered what we thought we needed from the seatainer (requiring two pickup trips) and started kitting these 5 towers.  Then, we ran into problems:

In the middle of all this diagnosis, moderate rain started up with low cloud covering the ridges, so it didn't seem to be a nice day for driving on the ridge or climbing anyway.  Rain is forecast to continue tomorrow.

We also slipped in a slight reorientation of the base WiFi access point.  I've calculated that it needs to point up by 230m across 2800m, or 4.7 degrees, and the mount only allows pitching up by 3 degrees.  However, by swapping the top and bottom brackets, we can tilt up up to 10 degrees.  This angle is now set to ~4.5 degrees.

We've decided to take our first (and probably only) day off tomorrow.  We assume that Monday will be busy preparing rsw02 for INEGI to instrument, while starting with rne01+ ourselves.  We also need to revisit tse13 to replace the bad POE cable (I verified that it had a short) that Per removed.