Institute the general high-level structure desired.

Keep comsrf, camice, camocn/somocn all as they are now, but create
the overall structure we have desired for the end for within stepon.
Start: July 8th, cam3_2_4_brnch_chghilev
Ideal engineering time: 1.5 weeks
Actual time: July 8th-August 19th (6 weeks) Load factor 4
(but if account for ESMF worshop which was a week, load factor 3.33)
6000 lines of changes.
240lpd