Create initial cut of cam_comp

Ideal engineering time: 3 days
Start Sep/1st
First checkin: cam3_2_22 – Sep/20/2005 4000 lines of code
Branch checkin: cam3_2_22_brnchT_chghilev_9 Sep/22/2005
Final checkin: cam3_2_24 Oct/3/2005
I had 2.5 days of vacation
Load factor: 4.2
This was significantly underestimated, there really was more work and difficulties with getting SCAM to work here.
200lpd
Create an initial cut of cam_comp. Put dynamics specific stuff inside a layer to hide it from cam_comp.F90 in control (stepon module)
Also put timers inside routines rather than in the main drivers.
Some of the following details are taken from the subrtize branch.