Now that I've left I should probably post what I did the last couple days and what still needs to be done.

Yesterday Kurt and Ned powered up the tall towers and we worked on making sure DSMs are staged approximately where the aux towers will be put up, and that sensor cables are all in the correct ports. The idea was to have everything on, collecting data, and on the network, even if the aux towers aren't up yet. Some other site-specific things I noted while doing this:

Lconv

Uconv

Rel


The ubiquiti network is up, with the omnidirectional antenna on the release tower. Out of the sites in the field, only P1 and P4 don't have line of sight to the release tower. The link to p4 works fine when the antenna at p4 is pointed through the trees to where the rel tower is, and I expect this will also be the case at p1. If it isn't, we have spare ubiquitis in the base trailer and could establish a relay on lconv, since I think p1 has line of sight to that at least. The link to the base trailers does not work, I'm assuming because line-of-sight goes directly through a barn. There's a faint possibility that setting up a relay to somewhere else at the homestead site (e.g. the tree between Ken's house and the road) could fix this, but I don't think that would be worth the hassle.