Preflight:

Checked radome lines, found small drops of water in the ADIFR top (but not a bubble of water) and a small bubble in the QCR. Lines were purged from the opening to the drain port.


Block out 2055L

Takeoff 2100L

DPL is not responding to changes during climb as it should. It is acting like it has a blocked inlet or is very wet/dirty. We will look at it tomorrow for maintenance.

0248 Replaced L-5 headset and found the earpiece twisted 180 degrees. Twisted it back and returned to the case. It still has batteries in it.

0251 DPL to max cool for testing.

0256 CAVP_DPL is now 30MB over DPR. This is different from what we saw yesterday.

0338 In cloud, data on all probes.

0551 2DC voltages on Diode #1 seem low at 1V vs 1.6V for the other diodes. We will clean tomorrow.

0845 in cloud, data on all probes.

0905 land.