RF21
Tech: Ivana
8/28/25
Power On: 0605
Engine Start: 0836
Takeoff: 0904
Landing: 1518
Pre-flight
-Re-installed CV #3
-Changed I-CIMS nitrogen cylinder (Left #6)
-Cylinder valve on L-10 NOX instrument's containment vessel is seized and can't be turned, so no NOy channel this flight
-SDI required power cycle to reach proper flow
-Water thermos next to microwave smelled like melted plastic, so unit unplugged for duration of project
SATCOM
-0906 Dropped
-0910 Reset
-0919 Recovered
-1002 Dropped
-1024 Reset
-1020 Recovered
-1113 Dropped
-1134 Reset
-1137 Recovered
-1224 Dropped
-1226 Reset
-1236 Recovered
-1318 Dropped
-1323 Reset
-1328 Recovered
-1415 Dropped
-1417 Reset
-1421 Recovered