May 5, 2026
PLWC power issue identified by Sarah - fixed.
Performed RICE functional test, followed by tech training.
Forward facing camera mounted in RWOB pylon is not operational. It will be replaced with the forward facing camera in the cockpit for the remainder of the project.
User support as needed.
May 12, 2026
Performed CDP Cal
Cleaned 2DS windows
Sarah performed 2DS functionality test
User support as needed
May 14, 2026
Purged 2DS with Nitrogen - RH went from 9.8% down to 6.8%
Cleaned 2DS glass
Cleaned CDP glass
Blew out pressure lines in radome. Moisture in QCR and bottom ADIFR line.
May 15, 2026
4 Comments
David Allbee
May 05, 2026May 5, 2026
PLWC power issue identified by Sarah - fixed.
Performed RICE functional test, followed by tech training.
Forward facing camera mounted in RWOB pylon is not operational. It will be replaced with the forward facing camera in the cockpit for the remainder of the project.
User support as needed.
David Allbee
May 12, 2026May 12, 2026
Performed CDP Cal
Cleaned 2DS windows
Sarah performed 2DS functionality test
User support as needed
David Allbee
May 14, 2026May 14, 2026
Purged 2DS with Nitrogen - RH went from 9.8% down to 6.8%
Cleaned 2DS glass
Cleaned CDP glass
Blew out pressure lines in radome. Moisture in QCR and bottom ADIFR line.
User support as needed
David Allbee
May 15, 2026May 15, 2026
User support as needed