Log in
wiki.ucar.edu
Spaces
Hit enter to search
Help
Online Help
Keyboard Shortcuts
Feed Builder
What’s new
About Confluence
Log in
PCAPS Field Project - ISFS
Edit space details
Pages
Blog
Blog
2013
January
2012
November
April
2011
September
May
April
March
February
January
Jan 31 Riverton, Shadowband
Riverton shadow band
Station 1 and 3 site visits, Jan 31
Status, Jan 31, 2011
Jan 30 Playa1, soil sample
Status, Jan 30, 2011
Jan 29 ABC2, soil sample
Jan 29 Riverton7, adjust shadowband
Status Jan 29, 2011
Jan 28 Riverton7, shadowband check
Jan 28 Hiland3, soil sample
Jan 28 Riverton7, adjust shadowband
Jan 28 Wvally4, router down
wvally4 comms
Status Jan 28, 2011
Jan 27 site vist riverton7
Jan 27 Site visit Eslope5
Status, Jan 27, 2011
hiland3 offline, then back
Stn2 Visit-2 26Jan11
Stn4 Visit 26Jan11
Stn1 Visit 26Jan11
Stn2 Visit 26Jan11
Status, Jan 25
Status, Jan 24, 2011
Stn 6 (2nd) Visit 24 Jan 2011
Stn 2 Visit 24 Jan 2011
Stn 3 Visit 24 Jan 2011
Stn 4 Visit 24 Jan 2011
Stn 6 Visit - 24 Jan 2011
wslope6 site visit, jan 23
River7 site visit, jan 23
Daily status 23 Jan
snow
Daily status 22 Jan
wvally4 site visit
eslope5 site visit
Daily status 21 Jan
playa1 site visit
daily status 20 Jan
wslope6 site visit
river7 site visit
wvally4 site visit
Daily status 19 Jan
River7 heat capacity
hiland3 site visit
Daily status 18 Jan
abc2 site visit, jan 18
Rain at base
hail
river7 site visit
eslope5 site visit, jan 17
hiland3 site visit, jan 17
playa1 site visit, jan 17
hiland3 RH down
TP01 values changing
wind variance variations
Daily status 16 Jan
abc2 site visit, jan 16
wslope6 site visit, jan 16
wvally4 site visit
TRH at wvally4 down
corrupt file from wslope6
Rsw
Daily status 15 Jan
River7 site visit
eslope5 site visit
hiland3 site visit
Daily status 14 Jan
checking station memory
Playa1 site visit
Site Visit Riverton7
router_check.sh script
site eslope5 visit
site playa1 visit
site wvally4 visit
site wslope6 visits
site river7 visits
site abc2 visits
site eslope5 visits
site hiland3 visit
Sonic Boom Angle, ABC check
visit site abc2, jan 10
site playa1 visit
site playa1 visit
wvally4 site visit, jan 9
wslope6 site visit
river7 site visit
eslope5 site visit, jan 9
hiland3 site visit, jan 9
Daily status 9 Jan
site eslope5 visit, jan 8
river7 site visit, jan 7
wvally4 visit
Daily status 7 Jan
wslope6 Site Visit
river7 site visit, Jan 6, 2011
Wslope6 site visit Jan 6, 2011
out of fog
Playa1 site visit Jan 6, 2011
Morning status 6 Jan
router power consumption
Eslope5 site visit Jan 5, 2011
krypton status
Playa1 site visit Jan 5, 2011
Soil sample processing
ABC2 site visit Jan 4, 2011
Hiland3 site visit Jan 4, 2011
flurries now at Residence Inn
trailer systems
Wvally4 site visit Jan 4, 2011
Hiland3 site visit Jan 3, 2010
crontab removed
Crontab changes on highland3
Highland battery voltage
Replaced kh2o at playa1, Jan 2, 2011
Playa1 battery change 1 Jan 2011
hiland3 power cycle 31 Dec 2010 3120 MST
river7 snow clearing
river7 rad mote
wslope6 snow clearing
Playa1 Snow Clearing
Highland and West Valley Jan 1
Snow depth at Hiland3 is 8.9 cm, 1700 UTC 1 Jan 2011
Recycle power at hiland3
abc2 cleaned 31-Dec 2010
hiland3 bat replacement 31-12-2010
2010
December
November
October
Browse pages
Configure
Space tools
A
t
tachments (0)
Page History
Page Information
Resolved comments
View Source
Export to PDF
Hide Inline Comments
Blog
2011
January
6
Jira links
out of fog
Created by
Steve Oncley
, last updated on
Jan 06, 2011
1 minute read
broke out of fog driving south on 172 at about 4000S at 09:17AM.
weather
Overview
Content Tools
{"serverDuration": 100, "requestCorrelationId": "6e4583f6b5d98cec"}