Wyświetlasz starszą wersję (v. /spaces/perdigao/blog/2017/01/31/329483251/Daily+status+31+Jan) tej strony.

pokaż różnice pokaż historię strony

Wyświetlasz aktualną wersję tej strony. (v. 1) pokaż następną wersję »

A lot of progress today:

  • The tower tension-checkers determined that all 10 and 20m towers should be safe to climb.
  • AC power was turned on to 2 towers: rsw01 and rsw02.  rsw01's WiFi was reprogrammed, though the access point for both towers is not yet up (soon?)
  • 2 stations (v04 and v05) were instrumented by us and also are powered on(?).
  • Another 8 stations were prepped at the the base of the mast, to be ready for the INEGI crew to climb tomorrow and move the instrumentation vertically.  There are a few details still to take care of at these masts, including preparing solar panels at 2 sites and installing soil sensors at 2 sites, but we expect that this will be quick.
  • 2 more stations were prepped at the ops center.
  • By my count, this leaves only 4 masts that are constructed but not yet prepped at the base.  We still think that these 4 can be finished Thurs & Fri.

 

 

 

  • Brak etykietek