You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

~0900: opened ref volume

- removed cap with capillary leak

- stuffed more steel wool (about double) in this side

- replace cap with solid cap

- removed sample cap

- stuffed more steel wool in this side

- replaced cap

0925-0937: sat in this configuration to allow P.0m to monitor Pref

0937:

- removed garden hose from CHATS system, noted that big hose fitting was somewhat loose, repaired with teflon tape?

- changed P.0m from AHATS Pref to garden hose/Bedard

- plumbed Pref back to CHATS system (using 11b.4.8m 202BG)

0955: covered up with dirt/space blanket again

  • No labels