I just added a spare Qsoil to base in a plot that I will water. My goal is to characterize the behavior of an EC-5 probe in this soil with high iron content. Hopefully, it will still have a slope of 1, but just an offset. Although the soil structure changes a bit from site-to-site here, the iron content appears (based on my magnet test) to be about the same at base as at near, so I am optimistic that these test results will be relevant to the other sites.
Probe is ECHO005/PIC015.
The plan is simply to water this plot to field capacity and watch it dry out, while taking gravimetric samples regularly -- at least daily.
15:00 took the first sample (still before wetting; soil was a little bit moist). I'll just measure the 3-6cm ring, as being close to the location of the EC5 (volume = 3*pi*(5.31/2)^2 )
10/25: 09:35 First watering. Water ponded. I'll wait a bit and reapply.
09:45 Second watering. EC5 still hasn't seen it.
10:00 Water #3. EC5 still hasn't seen it.
10:15 Water #4. EC5 noticeably rising.
10:45 Water #5. EC5 up quite a bit.
11:05 Water #6.
11:15 Water #7. I'll stop here.
11:40 EC5 beginning to flatten out.
Date  | 
Time  | 
Tare  | 
Wet  | 
Dry  | 
Rho  | 
Grav%  | 
Vol%  | 
EC-5  | 
|---|---|---|---|---|---|---|---|---|
10/24  | 
15:00  | 
2.4  | 
84.3  | 
77.8  | 
1.14  | 
8.3%  | 
9.5%  | 
9.5% (EXACT!)  | 
10/25  | 
13:30  | 
8.2  | 
129.0  | 
111.0  | 
1.55  | 
17.5%  | 
27.1%  | 
20.3%  | 
10/25  | 
16:45  | 
8.2  | 
117.0  | 
102.8  | 
1.42  | 
15.0%  | 
21.4%  | 
18.6%  | 
10/26  | 
11:00  | 
8.2  | 
108.3  | 
98.1  | 
1.35  | 
11.3%  | 
15.4%  | 
17.1%  | 
10/27  | 
09:15  | 
8.2  | 
102.6  | 
92.9  | 
1.27  | 
11.5%  | 
14.6%  | 
14.2%  | 
10/27  | 
13:25  | 
8.2  | 
128.8  | 
115.2  | 
1.61  | 
12.7%  | 
20.5%  | 
15.7%  | 
10/28  | 
16:30  | 
8.2  | 
141.0  | 
126.7  | 
1.78  | 
12.1%  | 
21.5%  | 
14.2%  | 
10/29  | 
15:20  | 
8.2  | 
109.3  | 
98.3  | 
  | 
  | 
  | 
13.3%  |