Warmer today with same clear skies and some very light haze.  Jaquie arrived this evening.  We will spend tomorrow showing her the ropes before Matt leaves on Tuesday.

ISS1 – all systems still running nominally with profiler status:  @ 1020 100m: 4.69A @ 50V & 1.844A @ 32V, and @ 1030 150m rass: 3.89A @ 50V & 1.892 A @ 32 V

ISS2 – No issues on Nagios.  Bill will be deciding if/when a factory reset of the lidar will occur after he hears back from Leosphere's tech support.  Still no sign of frost on the lens with the internal RH sensor showing between 13-15%.  

ISFS – No issues.  Helped Matt with a Leica measurement of the boom at the Memorial Hill site today with a nice view as we climbed the hill.


Soundings – There was a mild north wind at the sounding site during today's launch, but the sounding went off without a hitch.


  • No labels