*After initial taxi at 1545, we were held short by ATC until 1605.
UFT range 51 - 98
TCABCV range 59 - 82
DSM323 booted fine today.
FWD and DWN cameras operational today.
Opened "TechProjNotes" and it defaulted to a different workspace, as well as the workspace where I clicked the icon. If text does not appear when typing, try a different workspace.
QCL/Chiller circuit breaker remained disengaged today.
1537 - power ON RAF CN (sampled dirty air for far too long due to being held up by ATC)
UHSAS network connection having an issue shortly after takeoff. The ethernet cable at the network hub is not making a good connection.
Condensation dripping from AC vents at several locations. This is normal, but it will likely get worse when operations commence in Islip.
Small hiccup with FWD looking camera - display dropped out for a bit, but the status was still green. Try refreshing webpage before cycling camera script.
1 Comment
David Allbee
Jul 16, 202507/16/2025
Tech - D. Allbee
Taxi - 1545 / 1605* (UFT = 98)
Takeoff - 1616 (UFT = 98)
Land - 2139 (UFT = 77)
*After initial taxi at 1545, we were held short by ATC until 1605.
UFT range 51 - 98
TCABCV range 59 - 82
DSM323 booted fine today.
FWD and DWN cameras operational today.
Opened "TechProjNotes" and it defaulted to a different workspace, as well as the workspace where I clicked the icon. If text does not appear when typing, try a different workspace.
QCL/Chiller circuit breaker remained disengaged today.
1537 - power ON RAF CN (sampled dirty air for far too long due to being held up by ATC)
UHSAS network connection having an issue shortly after takeoff. The ethernet cable at the network hub is not making a good connection.
Condensation dripping from AC vents at several locations. This is normal, but it will likely get worse when operations commence in Islip.
Small hiccup with FWD looking camera - display dropped out for a bit, but the status was still green. Try refreshing webpage before cycling camera script.
1740 - 1915 Made flow adjustments to RAF CN.
1941 lost DP_VXL
2000 power cycled VCSEL
3x wing probes fully operational
SATCOM actions
1517 down
1627 power cycle
1634 power cycle
1654 returned
1740 down
1807 power cycle
1813 returned
1900 down
1912 power cycle
1918 returned
2005 down
2007 power cycle
2019 power cycle
2031 returned
2110 out