  1. First day attempting to use the A/C cart. However, the GPU does not provide 200 VAC which is required to power the A/C unit. In order to provide air conditioning to the cabin of the GV, the APU will be required on maintenance days for the foreseeable future while here in Costa Rica.


    Cleaned VCSEL mirrors.

     

    Cleaned DPR

     

    Decision made by SE team not to change out Router or Timeserver at this time.

     

    No standing water or condensation inside either radiometer.

     

    Cleaned RSTB lens.

     

    Blew out all nose lines.

     

    Power was dumped shortly after powering up ADS and some user instruments. No equipment damage reported.

     

    Auto A/D Cal is mostly good. S/N 1706 has fairly significant offsets

    Informed Project Manager and decided to wait until subsequent maintenance day to replace Analog card.

     

    Nose DSM overheated after being ran all day and will not finish boot sequence. Able to ping DSM but does not fully boot.

     

    Performed CDP Cals

    *May have started with 2um beads by mistake or may have sprayed two sizes twice. Regardless, the size distributions appear reasonable.