13:30 - 14:30, Dec 21
Replaced Tsoil probe.
Lowered mast to clean krypton, clean solar, and clean radiometer
trailer test: brought probe back to trailer and did a visual check.
There was no sign on moisture in the connector. Did a simple ice
bath test and the probe was reading high. Will take back to Boulder.
twh (3/1/11): high-rate data indicate kh2o cleaned at 14:03
high-rate u,w suggest mast down 13:59 - 14:05, but light winds make this ambiguous
(3/3/11): high-rate pressure data confirm 13:59 - 14:05