Log in
wiki.ucar.edu
Spaces
Hit enter to search
Help
Online Help
Keyboard Shortcuts
Feed Builder
What’s new
Available Gadgets
About Confluence
Log in
SCP Field Project - ISFS
Pages
Blog
Blog
2015
May
2013
December
August
February
January
2012
December
November
October
Kryptons and Licors on the main tower
Station C20 communications
Daily Status Wednesday 10-31-12
Daily Status Tuesday 10-30-12
Qsoilc backup
Daily Status Monday 10-29-12
Qsoil.c at 11 running
Tower Guywire Tension
Daily Status Sunday 10-28-12
Daily Status Saturday 10-27-12
power mote at 6 out
When It Snows
Daily Status Fri 2012-Oct-26
incorrect chrony config causing loss of cockpit data
Daily Status Thur 2012-Oct-25
Power Check 2012-Oct-24
Daily Status Weds 24-Oct-2012
10m Sonic on Main
Station 6 issue, ntpd and tee_tty
Daily Status Mon 2012-Oct-23
Daily Status Monday 10-22-12
Daily Status Sun 2012-Oct-21
Aph3 stopped recording TRH and Handar
Daily Status Sat 20-Oct-12
A2 CSAT Swapped
Daily Status Fr 19-Oct-12
Gully, AP2 Bluetooth Problems
Daily Status Th 18-Oct-12
A17 communication failure
CSAT at A2 has signal lock issue
How To and list of Reset Sampling Rates on serial TRH's
Daily Status Wed 17-Oct-12
cockpit additions
Daily Status Tues 16-Oct-12
TRH Cleaning, outages
Daily Status Mon. 15-Oct-12
TRH outage Ah6, A17
Soil.g down, restarted
Rad Mote Timing Change, Cleaning
Snow Survey Investigator
Daily Status 14-Oct-12
Daily Status Sat 13-Oct-12
status
270 degree direction change
Tsoil fixed?
Change of nanobarometer settings
Video team here
a8 trh cable swap
cleanings
declination
Qsoil.c testing
sonic diags
instrument status
frost this morning
a11 trh restarted
a9 TRH restarted
a8 TRH restarted
A16 TRH restarted
updated soil power reporting
M power
A19 TRH fix
Fan current max set to 80mA
Soil mote data rate lower
survey day
interesting wind profile now
Increasing TRH fan current
East end transformer odd
Fixed C pressure
great conditions
issues
licors set to 20sps
kryptons kleaned
TRH mote at 8 switched to serial
Batteries
Power at main and 11
Restarted 2m TRH fan on 5
bad tsoil installed
TRH adjustments
New base system laptop
snow
bad spare Tsoil
restarted 2 fans
power adjustments
light frost last night
Tsoil.c oddness
today's rounds
boom angles (finally)
Today's rounds
Damage Report
tio command odd
restarted TRHs
work on 2 Oct
nanobarometer fix
September
August
Browse pages
Configure
Space tools
A
t
tachments (0)
Page History
Page Information
Resolved comments
View Source
Export to PDF
Hide Inline Comments
Blog
2012
October
11
Jira links
cleanings
Created by
Steve Oncley
, last modified on
Oct 11, 2012
From about 0830-0840, cleaned: Rlw.in, Rlw.out, Rsw.in, Rsw.out, Li7000.2m, Li7000.1m
radiation
licor
Overview
Content Tools
{"serverDuration": 93, "requestCorrelationId": "8534333ec1e81b02"}