  • Took care of punch list items, except for the Y cable that I forgot at the bottom of the mountain.
  • Took soil core
  • Did nothing to the TRH (should have at least checked that the cable was seated well, but didn't)
  • Found that the Ott is misconfigured – need to try to do this remotely.
  • Tilted down the mast to clean the EC150, but didn't help the data much.  I suspect the desiccant bottles may need to be changed, but that would invalidate the data for a day (and require a calibration check?)
  • While mast was down, move the QDP to the other side of the sonic (away from the EC150).
  • Need to add to standard visit check: reseat cables (at DSM); move wetness sensor flat (done today)
  • Also noted that one bolt holding the capture plate had thread damage.  Replaced with another slightly-less-damaged bolt, but should replace with a new one.
  • Finally, need to add more site direction documentation – Google maps was somewhat off.