...
- test heating scripts
- it appears that I'm close to parsing the RAD_LOGGER message correctly, but we should check with Sebastian. I suspect that my "Rpile" variable from him really is an uncalibrated pile voltage.
- why are there still "Early sample...prior to sorting window" errors using prep? I thought our new timing fixed all this!
- why are there frequent "EMERGENCY|SampleOutput: inet:128.117.43.122:30010: IOException: inet:128.117.43.122:30010: send: Message too long, disconnecting" error messages on the DSM consoles? Could these be from the OTT, that reports something like a 32k byte sample?
- create irga_co2/h2o.dat QC files by height for supersites
- update all csat.dat QC files once boom angles are known.
Sonic status:
| site | ec100 | ec150 | csat |
|---|---|---|---|
| up | ok | ok | ok |
| lc |
| ok (fuse replaced) | ok | ok | |
| cc | ok | ok | ok |
| dc | ok | ok | ok |
| sp | ok | ok | ok |
| sh | ok | ok | x |
| mh | ok | ok | ok |
| pc | ok | ok | ok |
| mw | ok (replaced) | x |
| ok (replaced) |
| prs.1m |
| ok (replaced) | ok | ok | |
| 2m | ok (replaced) | ok | ok |
| 3m | ok | ok | ok (replaced) |
| 7m | ok | ok |
| ok (replaced) |
| 17m |
| bad port (will need to replace dsm) | ok? | ok? |
| 32m | ok | ok |
| ok (replaced) | |||
| dcs.1m | ok | ok | ok |
| 2m | ok | x | ok |
| 3m | ok | x | ok |
| 7m |
| ok |
| ok |
| ok |
| 17m |
| ok |
| ok |
| ok |
| 32m |
| ok |
| ok |
| ok |