...
Did some more power rearrangement after working through the power spreadsheet. There still are some mysterious loads, but what we did should help for a while. relm should now be being monitored.
- Added extra 65W solar panels to UConv.m and Init.m.
- Took a battery from Init.b and added it to Lconv.m.
- Took a battery from Uconv.1, added it to Uconv.m
- Added power monitor cable to Rel.m