Just to put this in one place: (number of minutes)

  • DONE Flip uw.1m sonic (the head to the cassette) (5) 
  • 3/4 DONE Upgrade software on snow pillows (20)
  • DONE Install CSAT3BH (15)
  •  DONE Seal all CSAT cassette mounts (120) 
  • DONE Clean radiometers (2m NR01 and 9m K&Zs) (10)
  • DONE Another soil sample (10)
  • DONE Install wifi extender, attached to cm dcdc power (and swap in 20W dcdc converter) (15)
  • DONE In cb and cl, move the ethernet switch power from bank1 to the dcdc terminal on the power panel (bring extra dcdc converters?) (5)
  • DONE Check new pillow prompting code that Gary may install (unknown)
  • DONE Read guy tensions (20)
  • Remove cassettes from spare CSAT3As, if time allows (15)

...