  •  Gas for generator
  •  Mount ubiquiti at pedestal, mount waterproofing box for POE injector
  •  Set static IPs for ubiquitis and DSM (assuming I have heard back from CISL)
  •  Check ubiquiti connection (looks like line-of-sight won't be a problem)
  •  Lower tower (once we have gas in generator) and:
    •  Replace tape w/ bulgin caps on EC100 boxes
    •  Remove tennis ball
  •  DSM serial board troubleshooting. Bring some fuses and maybe try unplugging sensors one by one to see when it fails.