You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »

Hoping that this visit can occur while the road is still open...

Just to put this in one place: (number of minutes)

  • Flip uw.1m sonic (the head to the cassette) (5) 
  • Upgrade software on snow pillows (20)
  • Install CSAT3BH (15)
  • Seal all CSAT cassette mounts (120) 
  • Clean radiometers (2m NR01 and 9m K&Zs) (10)
  • Another soil sample (10)
  • Install wifi extender, attached to cm dcdc power (and swap in 20W dcdc converter) (15)
  • In cb and cl, move the ethernet switch power from bank1 to the dcdc terminal on the power panel (bring extra dcdc converters?) (5)
  • Check new pillow prompting code that Gary may install (unknown)
  • Read guy tensions (20)
  • Remove cassettes from spare CSAT3As, if time allows (15)

Total: (235 min = 4h, but could do some tasks in parallel)

What to bring:

  • individual allen wrench set with 5/32" (on shelf)
  • snow pillow cable and windows laptop (on shelf)
  • CSAT3BH and mount and mounting bolts (on shelf)
  • Seal and Peel and caulk gun (grab another gun from home)
  • Kim wipes and alcohol (still need alcohol)
  • soil kit (on shelf)
  • wifi extender and cables and dcdc converter (from Gary)
  • more dcdc converters
  • my tool bag (in car)
  • tire chains
  • No labels