Setup Day 3
Lots of people and stuff.  Started about 8:30, lunch break 12:00-2:00; Ended at 5:00
(Chris, Kurt, Rudy, Jesse, Steve O, Steve S, John, Mike D visited)
By lunch time:
- TP01 reinstalled in grass soil site
- all solar panel stands (except for 2 still in base trailer) positioned (still not staked)
- main tower up to 50' with permanet guys
- base trailer delivered, leveled, porch&steps set up 
After lunch:
- main tower completed
- base powered up
- rental truck loaded with sensors, etc. for second run (tomorrow)
- Gordon/Andrew got networking working in lab; plan is to install data systems on Monday.
Tomorrow is sensor day!
(Entered on Friday for Thursday, since internet at the RIC was down.)

Lots of people and stuff.  Started about 8:30, lunch break 12:00-2:00; Ended at 5:00

(Chris, Kurt, Rudy, Jesse, Steve O, Steve S, John, Mike D visited)

By lunch time:

- TP01 reinstalled in grass soil site

- all solar panel stands (except for 2 still in base trailer) positioned (still not staked)

- main tower up to 50' with permanet guys

- base trailer delivered, leveled, porch&steps set up 

After lunch:

- main tower completed

- base powered up

- rental truck loaded with sensors, etc. for second run(tomorrow)

- Gordon/Andrew got networking working in lab; plan is to install data systems on Monday.

Tomorrow is sensor day!