September 17, 2012
Afternoon - Early Evening
Chris and Jesse on site.
Began to dress the Main Tower this afternoon. Set the Rohn clamps at 20,10,5,4,3,2,1 and 0.5m. Hung instruments on upper three heights.
20.5m: 0741, B4 (this cable was marked with flagging and a BUNCH of knots.
10.00m: 1119, 1393 (this cable was marked with just flagging tied to coiled cable.
5.01m: 0538, B5 (no cables hung on this level).
4.05m:
3.03m:
2.0m:
1.04m:
0.50m:
The ATV was unloaded and locked underneath the Base Trailer. The ramps were also locked to trailer.
The fence stairs have been secured and stable. A LOT better than first week of set-up.