At my request, Steve just pinched closed the leak I added yesterday to the AHATS pressure reference system. I hadn't seen much reduction of the high frequency temperature fluctuations in the Pref signal since this leak was introduced. (Though it definitely had an affect on the low frequencies, where P and Pref were perfectly correlated.
This was done about 10:11am.