You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Current »

10/6/13, twh

Gordon and Tom serviced the RIM tower

Arrived 12:35 pm, left site at 2:00 pm

Taped Gordon hole.

Replaced Verizon modem ethernet cable.

Replaced 20m TRH SN 11 with SN 28 because 20m T was anomolously high.  However the new TRH only lowered the anomaly a bit.

Calibrated DataScope; 5m CSAT: 61.9, 61.7, 62.0, 62.1, 61.7, 61.9, 61.7, 62.1 (mean=61.9 magnetic).

  • No labels