Weather: Cool and foggy morning, with overcast conditions for the remainder of the day.

Tasking: 

  • S1 (SBC Fire Station 18) teardown. Went smoothly save for the following issues:
    • A crack formed in the lower collar/pivot point of the tripod assembly. Collar will have to be replaced. 
    • TRH fan inop.
    • Unable to connect to DSM. Site was powered. May be a static IP issue, will investigate in Boulder.
    • Tripod leg pads had play, ground on this site compacted. Future tripod installations will have to be releveled during maintenance visits due to soft ground.
    • CSAT 3A stiffener brace weld broke, will need to be epoxied 

Plan for tomorrow

  • S4 (San Marcos Foothills Preserve) teardown. Meeting ranger for access at 8:30 am. 