Many tasks:

  • Met with Electrician Tom and showed him the plug we need for CLAMPS.  He should be able to get it installed before CLAMPS arrives on 12 July.
  • Fully extended TT and left it (guyed) that way.  Noted that the tower near the balloon inflation shed is the same height, so not worried about aircraft
  • Reinstalled soil sensors – also training for Chris
  • Removed the previous extension cords that initially were providing power to TT
  • Matt did Leica scans of all the sensors, using a GPS-based coordinate system!!!
  • Isabel added ISS to the Ubiquiti network, which broke the ISFS link temporarily.  She'll probably be adding a separate blog post about this.

TODOS:

  • shoot boom angle the old way with a compass, just as a check on the Leica data
  • work up the Leica data
  • recheck soil data coming in
  • at some point, take some soil cores?
  • keep on thinking about whether to lower TT
  • place a warning label on the power supply in the job box

John S and Liz also were on site working to get 449 working.  They thought they'd get it running before they left today.

  • No labels