Misc stuff today

  • cleaned up base a bit more
  • Give Isabel a tour of satellite sites:
    • DC: took soil core; took photos; shot boom angle
    • LC: took soil core; took photos; shot boom angle
    • UP: took soil core; took photos; shot boom angle
    • PC: took photos; shot boom angle; reseated Tsoil sensor side Binder connector (preventative from a few days ago)
    • MH: took photos; shot boom angles
  • Lowered DCS TT to replace 7m thermocouple, which turned out to be okay (just poor connection in logger box, down from about 1440-1650.
  • Isabel rebooted cc, which brought the HRXL back to life.

1 Comment

  1. Steve Oncley AUTHOR

    Noted that the HRXL at MH could have the job box in the field of view, though it looks like the set-up crew tried to minimize this influence.  A different location for this HRXL wasn't obvious to me, however.