Tony and Chris did much of the staging and organizing that normally happens in Boulder berfore the project.  We created 8 job totes, that will get us half through setup.

Organized tools and made sure that we had enough of everything for two teams.

Organized the staying of Dexter for an extra week to help out ISFS during the long carry sites, and during the transition to two teams (Thanks Dexter!!)

Went back to S4 to finish up setup:
 - install second set of soils.
 - add groupnd strap
 - wrap the cables
 - played with solar connection and swapped output location until we were seeing changing of ~ 1.8 Amps.
 - key for the gate now hangs in the base trailer next to ranger's card.